Kohtla-Järve Elektrijaam — Cooling Tower Reconstruction (40 MW)

EPC contract for cooling tower reconstruction (40 MW cooling capacity).

Project Overview

Full turnkey EPC contract for the reconstruction of the cooling tower at Kohtla-Järve Power Plant. The scope included replacing internal fill packings, drift eliminators, and water distribution systems to ensure a reliable 40 MW cooling capacity.

Key Specifications

  • Client: Kohtla-Järve Elektrijaam
  • Cooling Capacity: 40 MW
  • Contract Type: EPC (Engineering, Procurement, Construction)
Cooling Tower Reconstruction