Project Overview
Turnkey EPC project for design, procurement, and construction of a modern dry pneumatic fly ash removal system for the BKZ-75-39FSl boiler at VKG Energia OÜ. The system enables efficient ash collection and pneumatic transport over a distance of 250 meters to the storage silo.
Key Specifications
- Client: VKG Energia OÜ
- Equipment: BKZ-75-39FSl boiler
- System Type: Pneumatic ash transport
- Transport Distance: 250 m