Iru Elektrijaam — Natural Gas Supply System Upgrade for 3 x 100 MW Boilers

Natural gas supply system upgrade for three 100 MW boilers and automatic ignition logic design.

Project Overview

Comprehensive retrofit of burner gas piping skids and regulation trains for three 100 MW hot water boilers (300 MW total capacity) at Iru Power Plant. The project included safety shut-off valve modernization, flow metering, and the design and implementation of automated burner ignition and flame safeguard control logic.

Key Specifications

  • Client: Iru Power Plant (Iru Elektrijaam)
  • Equipment Capacity: 3 x 100 MW hot water boilers (300 MW total)
  • Medium: Natural Gas
  • Scope: Gas piping design, safety shut-off system upgrade, automated ignition control logic
Iru Power Plant Gas System Upgrade